UK construction companies reported a sharp increase in business activity during November, and optimism is continuing to grow that the worst period of supply delays might have passed, according to the latest figures from IHS Markit / CIPS.

Fewer than half of businesses (47%) now cite longer delivery times compared with the June peak of 77%.

However, rapid input price inflation persisted and haulage driver shortages added to cost pressures, the report adds, but the latest overall rise in operating expenses was the least marked for seven months.

Tim Moore, Director at IHS Markit, which compiles the survey said: “November data highlighted a welcome combination of faster output growth and softer price inflation across the UK construction sector. Commercial building led the way as recovering economic conditions ushered in new projects, which helped compensate for the recent slowdown in house building. Major infrastructure work also boosted construction activity in November, as signalled by the fastest growth in the civil engineering category since August.

“Input price inflation remains extremely strong by any measure, but it has started to trend downwards after hitting multi-decade peaks this summer. The latest rise in purchasing costs was the slowest since April, helped by a gradual turnaround in supply chain disruption and a slight slowdown in input buying. Port congestion and severe shortages of haulage capacity were again the most commonly cited reasons for longer lead times for construction products and materials.”

Duncan Brock, Group Director at the Chartered Institute of Procurement & Supply, said: “UK construction enjoyed a rebound in November with the fastest level of output growth for four months as supply chain managers increased their purchasing activity to meet a strong pipeline of new building projects. “Commercial orders were the strongest, picking up the slack from the subdued housing and civil engineering sectors and demonstrating that business confidence in the UK economy was improving.

“Adding to this positivity was signs of recovery in supply chain performance with just 47% of construction firms reporting longer waiting times, which is the smallest number for eight months. Even with this glimmer of hope that the pressure on deliveries was easing, purchasing remained at higher level to counteract disruptions from ongoing driver shortages and port delays as supply chain managers bought more than their immediate need.

“Job hiring growth was still maintained in November but was the weakest since March. Builder optimism was somewhat flat as the costs of building still remained high and firms struggled to stay competitive.”

Previous article‘Collaboration and innovation’ at Advanced Research Centre
Next articleFurther growth for quote provider Compusoft