Factory installed vented air solution
31st July 2018
The Big Data Institute at Oxford University has achieved its vented air requirements with the help of the Highline manual “Teleflex” system from TEAL PRODUCTS.
The 380mm Chain Opener system was pre-installed in 193 opening vents by façade manufacturer CIG Fassaden at its factory in Austria before installation in the establishment.
Teal’s larger were installed to achieve the vented air requirements to maintain a healthy environment.
Director Sam Yiend said: “Our large range of manual and electric window control products can be used in a variety of applications and building types. At Teal we pride ourselves not just on the products we supply, but also on our professionalism. Having such a huge number of openers and actuators in stock means that we have the solution for every application.”
www.tealproducts.com
|